An ADCP current survey was conducted in Tacoma Narrows during the February 18-19 2000 period of “spring” tides. The current data were required as input for design specifications for a proposed new bridge. The proposed bridge would parallel the existing bridge, with an offset of about 180 feet.

 

Printable Version